The East Coastway Line
The East Coastway Line links 20 stations, with a top line speed of 90 mph.
See the East Coastway Line on the live map
The map draws the line on its own, names every station along it, and shows the trains running on it right now.
The line in numbers
| Track | about 79 miles, counting every running line |
|---|---|
| Stations | 20 |
| Top line speed | 90 mph |
| Passengers a year | 31.7 million entries and exits across its stations |
No end-to-end length is given for this line because OpenStreetMap applies its name to several separate stretches of track, so any figure measured from the map data would be a fragment of the real route rather than the whole of it.
Stations on this line
- Brighton15.3 million a year
- London Road (Brighton)391,726 a year
- Moulsecoomb444,586 a year
- Falmer1.4 million a year
- Lewes2.6 million a year
- Cooksbridge91,322 a year
- Plumpton104,762 a year
- Polegate1.1 million a year
- Hampden Park861,166 a year
- Eastbourne3.8 million a year
- Pevensey and Westham165,740 a year
- Pevensey Bay5,848 a year
- Normans Bay22,490 a year
- Cooden Beach131,188 a year
- Collington182,218 a year
- Bexhill1.5 million a year
- West St Leonards138,188 a year
- St Leonards Warrior Square1.0 million a year
- Hastings2.2 million a year
- Ore272,106 a year
The busiest station on the line is Brighton, 15.3 million entries and exits a year and 28th busiest in Britain.
Lines it meets
Brighton Main Line, Hastings Line, Marshlink Line, West Coastway Line.
Passenger figures are the Office of Rail and Road's estimates of station usage for 2024-25, added up across the stations on this line. They count entries and exits at those stations rather than journeys along the line, and a station served by more than one line is counted for each of them.